Category:
Healthcare, Energy/Infrastructure
Location:
Camden
Client:
Hospital
Budget:
$30.2 Million
Cooper University Hospital – 4.6 MW CT
Camden, New Jersey
This hospital received $28.2 Million grant through the New Jersey Economic Development Authority (EDA) Energy Resiliency Bank Program (ERB) for a new Combined Heat and Power (CHP) Plant.
The CHP plant consists of a 4.6 MW recuperated combustion turbine generator, with heat recovery steam generator. It also includes a 1,000 ton steam driven centrifugal chiller. As part of the ERB program requirements, this CHP plant will provide 100% of the peak steam needs as well as provide significant non-electric cooling capacity and will allow the hospital to operate normally during a 7-day period without delivery of fuel, and is capable of black starting.